Partly Cloudy

Partly Cloudy

max temp: 8°C

min temp: 7°C


Ipswich: New improvements ready as rail line nears completion

09:00 22 March 2014

A general view of part of the Ipswich Chord which is due to open on the 31st March

A general view of part of the Ipswich Chord which is due to open on the 31st March

As construction work on the £35million new Ipswich Rail Chord is completed this weekend, attention has now shifted to further major improvements to the network.


Work to replace Haughley junction could start within the next two years. And then there could be a major upgrade of Ipswich station itself.

The chord – which links the Felixstowe branch with the north-facing main cross-country line to Peterborough, the north and midlands – will be fully opened for cross-country trains from March 31.

Its opening will cut journey times by between 45 and 75 minutes as trains no longer have to reverse in the Ipswich freight yard.

Work on the £35m project started in 2012, and received a major grant from the European Union to help finance the scheme.

Rail minister Stephen Hammond visited the site to see the progress of the work. He said: “This is very important for Felixstowe, this region and the country as a whole. It will make it much easier to get goods to and from the port.

“It also has a very important environmental benefit because it should take many more lorries off the roads.”

The completion of the work should allow Network Rail to look again at its operations in the Ipswich area as trains will no longer have to turn around there.

This could mean moving the fuelling point, currently next to Platform Four at the station, to a new site at Ipswich or even at Felixstowe port.

That would free up space for the possible construction of a new bay platform for trains heading to Peterborough and Cambridge.

Rob Fairhead of Network Rail said: “Those proposals are not in our current long-term plans but they are the kind of developments we could look at in the future.

“We have talked to the port about moving the fuelling area to the port but there is nothing firm yet – but the chord will make a huge difference to the way we operate.”

Haughley junction is one of the most serious pinch-points on the route and is due to be changed, probably turning it into a full junction that both passenger and freight trains will be able to travel over much faster.

That is in the next Network Rail planning period – and Mr Fairhead hoped it would be completed during the first half of the five-year plan.



  • Glad to see that Haughley Junction is firmly in the frame, it always seemed a bit silly to go to all the bother of building the Ipswich chord without improving it. Doubling from Soham to Newmarket should also figure (it wouldn't be hard) and also the Felixstowe line beyond Warren Heath. Not much one can do about the line round Ipswich itself.

    Report this comment

    Baptist Trainfan

    Saturday, March 22, 2014

  • Call me old fashioned but.... how will freight trains be able to go straight from Felixstowe to the Midlands via this loop without refuelling? And if they can do so then why is the refuelling point needed at Ipswich anyway?

    Report this comment

    John Alborough

    Monday, March 24, 2014

  • Another bay platform beyond Platform 4 at Ipswich might help relieve the frequent tedious waiting after coming from London at the other end of the tunnel while Platform 3 or 4 is cleared. Ipswich Station is very congested and minor delays rapid escalate.

    Report this comment

    Roy Everett

    Saturday, March 22, 2014

  • Has Graham Newman decided where he's going to put the traffic lights?

    Report this comment


    Saturday, March 22, 2014

The views expressed in the above comments do not necessarily reflect the views of this site

The Buttermarket Centre will become a £35m pleasure palace

Excitement is building as Ipswich prepares to welcome a string of big-name restaurants as part of the Buttermarket makeover.

It's been a busy day in Ipswich

All the news from a busy day in Ipswich in video form, including the closure of Marks and Spencer, station revamp and sport.

Felixstowe Beach Station not long before demolition in 2004.

Investigations are under way following clearance work at the former site of a historic railway station.

How well do you know your cars?

Test your knowledge in our car photo quiz and see if you can identify which car is which from just one small feature.

Company director spared jail

A Suffolk company director who crushed a worker to death was spared jail by a judge at Norwich Crown Court today.

The fire service cordons off an area near Marks and Spencer in Westgate Street where UK Power Networks works to find a  carbon monoxide leak

Marks & Spencer in Ipswich town centre was closed for most of the day after a carbon monoxide leak was detected.

Stores in Ipswich ready for Black Friday.

Black Friday is nearly upon us and it is set to kick off the busiest Christmas online shopping periods.

Foundation Street, Ipswich, around a century ago. Little remains of the ancient buildings in this street. This photograph was taken from near the junction of Lower Brook Street.

Foundation Street is one of the oldest streets in Ipswich, connecting the port with the town centre. Buildings which had stood for centuries were demolished in the early 1960s in what was then seen as “improvements”.

Hawkedon Veterinary Surgery is sponsoring a bag dispenser and bags for dog walkers to pick up and dispose of dog’s mess in Nowton Park, Bury St Edmunds. Left to right, Cllr Joanna Rayner and veterinary surgeon Rosina Page-Baker with Marley the dog.

A new initiative to reduce dog fouling in west Suffolk has seen dog bag dispensers installed at two popular parks.

Most read

Most commented

Topic pages

Local business directory

Suffolk's trusted business finder

Property search

e.g. Oxford or NW3
Powered by Zoopla

Digital Edition

Read the Ipswich Star e-edition today E-edition

Great British Life

Great British Life
MyDate24 MyPhotos24