Partly Cloudy

Partly Cloudy

max temp: 5°C

min temp: 1°C

Search

Suffolk: New-look trains set for debut next year on Greater Anglia line

08:46 17 April 2014

Disruption on mainline train journeys

Disruption on mainline train journeys

Refurbished InterCity trains on the main line between London and East Anglia should start entering service early next year – and should be fully operational by the end of the extended franchise in October 2016.

Welcome for train improvement proposals

Passengers heading to London from Ipswich have welcomed the news that trains to the capital are to get a fresh new look – but feel the improvements are long overdue.

Geoff and Angie Ashton from Rushmere St Andrew near Ipswich were heading to the capital with their daughters Melanie and Kelly for a day out.

Mr Ashton travels to London about twice a week for work, and felt the improvements could not come soon enough.

He said: “That is very good news – it’s about time. The trains on this line are not very good compared with other parts of the country. If they’re going to do all that work then it should be more comfortable on the trains.”

John Franklin from Woodbridge travels to London almost every day, and also welcomed the news about the improvements to trains – he was particularly keen to hear that more seats would be provided.

He said: “The number of people travelling continues to increase, the 7pm train is dreadful. It is good that more seats will be provided, but will there be shorter trains and more crowded trains while the work is taking place?”

The carriages are getting new seats, lighting, and carpets. Wi-fi connections will be improved and power points will be installed at seats. The toilets will have tanks fitted so they no longer flush on to the tracks.

Catering carriages will be converted so they have more standard class seats for passengers.

Greater Anglia has 119 InterCity carriages, and the work will mean a number are being converted at any one time – but there should still be enough carriages available for full trains to run on the main line.

Jonathan Denby from Greater Anglia said: “Passengers should notice a significant improvement. They should be more modern and there will be more seats on trains with the changes to the catering vehicles.”

The refurbished carriages are expected to remain in service until 2019 or 2020, by which time the new long-term franchise will be well under way and either new trains or a major upgrade of services will be in the pipeline.

The electric locomotives have already been refurbished – and if Network Rail improvements to the main line permit its speed to be increased to 110mph the trains would be able to run faster.

Mr Denby added: “This is a very significant upgrade of the service and comes after considerable work by councils, MPs and others who are keen to improve services in this region.

“We would not have secured such significant improvements during what is a short-term franchise extension without this local pressure.”

10 comments

  • Disgusted and shocked that in this day and age toilet waste is dumped on the track! This might have been acceptable until about 30 years ago. How can this be tolerated today?

    Report this comment

    Steve Blake

    Thursday, April 17, 2014

  • It's a silk hat on a pig. Lipstick makes no sense and is in fact weird!

    Report this comment

    Lee Davies

    Thursday, April 17, 2014

  • We're supposedly getting close to the end of carriages being withdrawn for outside refurbishment (i.e. which really means branding to Shambellio Greater Anguish colours, yet another coat of paint!). Now once they're all back, they start taking them out again to refurbish the insides - what clowns. Why not do it all at once, or wouldn't the taxpayer cough up then? Make no mistake, this is all paid for by fares and taxpayer subsidy so why do they treat us as idiots with this sanitised spin? This is almost Cut and Paste from what National Express said years ago when they inherited these old BR carriages from Virgin. "Putting lipstick on a pig" is dead right T Doff.

    Report this comment

    Disbeliever

    Thursday, April 17, 2014

  • Great to read, but there is no mention of any improvements in the 'areas' that take luggage or wheelchair space. It seems to be the idea of 'dress up the sardine cans' and everybody is happy.

    Report this comment

    Neil Nield

    Thursday, April 17, 2014

  • Refurbished trains for 'second class' Suffolk ! 'Out in the sticks', out of mind !! 'Tractor Boys' !, country yokels !!

    Report this comment

    freedomf

    Thursday, April 17, 2014

  • The stations will continue to deteriorate above eye level. Nothing is painted or maintained above that height.

    Report this comment

    John Alborough

    Thursday, April 17, 2014

  • "but there should still be enough carriages available for full trains to run on the main line" They aren't running full trains at the moment

    Report this comment

    Angry Commuter

    Thursday, April 17, 2014

  • These trains have had so many coats of paint, I'm surprised they can get through the Ipswich tunnel.

    Report this comment

    m01

    Thursday, April 17, 2014

  • Its all good, except there is a greater chance of not getting a refurbished seat... having to stand and admire the refreshed seats that someone else is sitting on. I am sure the trains themselves wont look any newer than they are now - especially from the outside.

    Report this comment

    Ipswich Entrepreneur

    Thursday, April 17, 2014

  • If the trains don't run on time, or at all, then this bit of modest refurbishment, albeit welcome, seems akin to "putting lipstick on a pig".

    Report this comment

    T Doff

    Thursday, April 17, 2014

The views expressed in the above comments do not necessarily reflect the views of this site

A Christmas Day drink-driver who agreed to give his friends a lift is the latest motorist caught in Suffolk police’s festive crackdown to lose his licence.

Hospital admissions as a result of self harm are above the national average in Ipswich.

Just one Suffolk school is considered to be under-performing in updated 2016 secondary school performance levels that measures the progress students make between the ages of 11 and 16.

Suffolk County Council’s publication of possible routes for a northern by-pass for Ipswich does take the project forward – but there is a very long way to go before any new road is built.

An Ipswich GP practice has been rated “inadequate” by health inspectors after they found patients were at risk of harm due to failures to act on safety assessments.

Two breakdowns on the Orwell Bridge were reported to be causing delays for drivers this morning.

School dinners in Suffolk have been given a makeover to encourage more youngsters to get a healthy meal in the middle of the day.

Central Suffolk MP Dr Dan Poulter has called on motorists to consider using other ways of getting to work – especially if they live near their workplace.

An uninsured Suffolk driver who sparked a five-hour full-scale police search after fleeing a crash scene and then lied to an officer has been given a community order.

The mother of a brave Ipswich teenager who died of a rare form of leukaemia at the age of 17 says she ‘always had a smile on her face’.

Most read

Most commented

HOT JOBS

Show Job Lists

Topic pages

Streetlife

Newsletter Sign Up

MyDate24 MyPhotos24