Partly Cloudy

Partly Cloudy

max temp: 25°C

min temp: 19°C

Search

Suffolk: Potholes behind up to 7,000 complaints reported by drivers in six months as ‘shocking’ road network faces fresh scrutiny

10:22 30 April 2014

There were 2,908 urgent 24-hour call-outs and 4,350 priority one (14 days) incidents in Suffolk in the last six months. Potholes are behind the majority of these reports, which total 7,258.

There were 2,908 urgent 24-hour call-outs and 4,350 priority one (14 days) incidents in Suffolk in the last six months. Potholes are behind the majority of these reports, which total 7,258.

Archant

Up to 7,000 potholes have been repaired in Suffolk in the last six months, we can reveal.

But last night critics said this was “just the tip of the iceberg” with the number of motorists reporting serious defects and potholes on the county’s roads totalling almost 10,000 between last October and March.

Senior Labour figures seized on the disclosure to criticise Suffolk County Council’s handling of the “shocking” road network, calling for improvements in repair standards and response rates.

However, the Conservative-run authority said they worked “tirelessly” during the winter to deal with “extreme weather events”, insisting dangerous road defects are prioritised and tackled immediately.

The debate was triggered by a county council paper to be discussed at a scrutiny meeting next Wednesday. It said 9,948 complaints of potholes and other highway defects were reported to the authority in the last six months.

Broken down, there were 1,916 one-hour emergency call-outs and 774 ‘priority two’ (28 days) incidents. Both categories rarely involve potholes.

However, there were 2,908 urgent 24-hour call-outs and 4,350 ‘priority one’ (14 days) incidents. Potholes are behind the majority of these reports, which total 7,258.

Figures on whether the repairs were carried out on time were not available.

It was reported last October how compensation claims for damage caused by potholes on Suffolk’s roads rose by 253% in a year.

Suffolk County Council also spent £50.2m on repairs between 2011/2012 and 2012/2013.

Sandra Gage, Labour’s shadow roads and transport spokesman at the county council, said there has been a drop in repair standards, a poor response rate and poor communication with residents.

“Standards in routine maintenance have dropped and residents in Ipswich have inundated councillors with lists of roads that remain in a poor state,” she said.

“We are frequently unable to get a date when any works can or will be undertaken, let alone a satisfactory repair.”

She added new procedures are only now being considered following criticism from the opposition.

David Ellesmere, leader of the Labour-run Ipswich Borough Council, said the county is experiencing a “picture of chaos on the roads”.

“This is only the tip of the iceberg,” he warned.

“Anybody looking at the state of the roads in Ipswich will see the shocking state of repairs. The really worrying thing is historically we have had quite mild winters.

“We are concerned funding is not being allocated properly.”

Nationally, local authorities have warned Britain is on the brink of a major pothole crisis following the government’s austerity drive and severe winters. Council’s highways maintenance budgets were cut by 19% in the four years to 2015.

Safety campaigners warned of the dangers of cutting roads budgets, saying potholes cause death and serious injury, particularly to cyclists.

Paul Watters, head of road policy at the AA, called for roads to be resurfaced rather than filled.

He stressed central government funding must be poured in to capital programmes to improve roads rather than simply reacting to problems in a “vicious circle”.

“Potholes are an indictment of a bigger problem lurking beneath the surface. We are constantly playing catch-up,” he said.

Prime Minister David Cameron wants to attract private investment in roads. Nationwide, it is 68 years before the average road is wholly resurfaced.

A Suffolk County Council spokesman said that, despite a mild winter, the road infrastructure has suffered from high levels of rainfall, causing flooding and exacerbating potholes.

Saturated ground have prompted temporary repairs, with permanent repairs expected after they dry out.

He added serious and dangerous potholes are now being addressed in order of severity.

He said: “Our contractors, KierMG, have worked tirelessly throughout a very busy season to deal with some of the extreme weather events experienced across Suffolk.

“When it comes to road defects such as potholes, a consistent approach is taken across the county. No area is more important than another. If the defect is posing a significant safety issue to the public this will be dealt with as a matter of priority.

“We encourage all who come across a defect in the road to report it immediately via our online reporting system or over the phone.

“It’s key to note that potholes and road defects are registered with highways in two ways, through regular inspections of roads by the highways service and by the reporting system. Dangerous road defects are prioritised and are being dealt with immediately.”

7 comments

  • It might help if they had competent people actually building the roads in the first place. There are streets in Ipswich that have been resurfaced in the past year or so that are already collapsing.

    Report this comment

    beerlover

    Wednesday, April 30, 2014

  • I have heard people voicing the opinion that potholes in Ipswich itself used to be dealt with more quickly when IBC had the responsibility for fixing them; and that SCC are "not interested in Ipswich". If that is true - and I doubt it! - is it because the reporting line of communication is longer and more complex?

    Report this comment

    Baptist Trainfan

    Wednesday, April 30, 2014

  • I have to say I have been pleasantly surprised at how quickly and effectively the Councils have been filling in many potholes! Some other parts of the Country are third world comparably. But it is almost impossible to keep up because of the vast increase in road usage and the inevitable wear and tear. Plus you can't win when people complain a road has disruption due to "pothole repairs".

    Report this comment

    Disbeliever

    Wednesday, April 30, 2014

  • We thought they going to fill in the pot hole in the A14 the other week when they closed the road overnight for several days. But no they were just repainting the white lines - straight through the pot holes. At least they look nice now.

    Report this comment

    fredjag

    Wednesday, April 30, 2014

  • Mary Mary - we have one of the safest and well maintained road networks in the world. The fact that people are starting to notice these potholes shows how well they have been maintained until budgets seem to have affected efficiency

    Report this comment

    ipswichLAD

    Wednesday, April 30, 2014

  • I can't believe they are getting away with the state of our roads in this country when it is so dangerous to motorists and cyclists alike.Whatever happened to the health and safety brigade?!

    Report this comment

    Mary Mary

    Wednesday, April 30, 2014

  • I have used the on-line system to report potholes in my vicinity. I started in November and received a reply that they did not require attention. In February, I reported them again and received a reply that certain ones would be done within a month, the others would be monitored. Here we are in April and the "within a month" ones have not been done and the "monitored" ones now have yellow markings round them but still no repairs.

    Report this comment

    The original Victor Meldrew

    Wednesday, April 30, 2014

The views expressed in the above comments do not necessarily reflect the views of this site

Fire crews called to eastbound A14

Motorists face queues on the A14 this afternoon after a vehicle fire brought traffic to a halt near Ipswich.

Students at Stoke High School - Ormiston Academy celebrating their GCSE results this morning.

It’s been a successful day for Ipswich as pupils and teachers celebrate outstanding GCSE results.

GCSE results day at Kesgrave High School. Jonathan Durston celebrates his results.

It is a very special day for Kesgrave star student and head boy Jonathan Durston - who discovered he had achieved 12 A*s and one A in his GCSEs this morning.

The unveiling of Major Henry Wigglesworth in Ipswich.

Today Major Henry Wigglesworth is back where he belongs after a lengthy stay in hospital.

Martlesham Heath and Adastral Park

Martlesham Parish Council has outlined its opposition to the proposed devolution deal for Suffolk and Norfolk.

Comedian was drunk and disorderly

A stand-up comedian has been given a conditional discharge after he swore at a police officer who saw him urinating in the doorway of an Ipswich Labour Club.

Melton railway station

Police have released the digital likeness of a man they are hunting in connection with a rape at Melton railway station, near Woodbridge.

Liverpool Street station

London’s Liverpool Street train station has been evacuated following reports of a suspicious package.

Gambling addict damaged machine

A gambling addict flew into a rage and damaged a £1,000 fruit machine after losing money at an Ipswich amusement arcade, a court has heard.

Holywells Park

A teenager who raided an Ipswich park kiosk three times in a week stealing ice creams and drinks worth £2,500 has been spared custody.

Most read

Most commented

HOT JOBS

Show Job Lists

Topic pages

Streetlife

Newsletter Sign Up

MyDate24 MyPhotos24