Search

Disruption as safety checks to bridge create long tailbacks in Wherstead Road, Ipswich

PUBLISHED: 18:50 30 June 2016 | UPDATED: 19:43 30 June 2016

Wherstead Road

Wherstead Road

Archant

Drivers experienced long delays in and out of Ipswich this evening while safety checks were made to the railway bridge in Wherstead Road.

There were long tailbacks in both directions between the Wherstead Interchange and the Hawes Street junction, with some drivers reporting they had been stuck for more than an hour.

A Suffolk Highways worker at the scene said safety checks were scheduled to be made to the bridge between 4.30pm and 6.30pm.

Traffic was bad while the work was carried out, but a traffic light system was in place, he added.

They left the area at approximately 7pm, and the road is now clear.

Was your journey affected by the delays? Share your thoughts in the comments below.


If you value what this story gives you, please consider supporting the Ipswich Star. Click the link in the orange box above for details.

Become a supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Latest from the Ipswich Star