Demolition proposed for derelict Ipswich mill buildings

Two buildings on the waterfront are potentially to be demolished <i>(Image: Google Maps)</i>
Two buildings on the waterfront are potentially to be demolished (Image: Google Maps)
This article is brought to you by our exclusive subscriber partnership with our sister title USA Today, and has been written by our American colleagues. It does not necessarily reflect the view of The Herald.
Close Icon

Find, save and share Public Notices that affect you in the area.

Search the Public Notice Portal What is the Public Notice Portal?

What is the Public Notice Portal?

The Public Notice Portal carries statutory public notices published in local newspapers and is the fastest and most effective way of finding out what is happening in YOUR neighbourhood.

Search the Public Notice Portal

Plans have been submitted to demolish two long-vacant buildings at the former Cranfield Mill site on Ipswich's waterfront.

An application lodged with Ipswich Borough Council seeks permission to demolish Blocks B and C at the College Street site within the Wet Dock Conservation Area.

Two buildings on the waterfront are potentially to be demolished (Image: Google Maps)

The Victorian red-brick buildings were originally intended to be converted into flats as part of the wider Cranfield Mill redevelopment approved in 2005.

However, planning documents state they have stood empty for decades and have deteriorated to the point where they are unsafe to enter.

A structural assessment identified failing foundations, widespread rot within floor structures and significant corrosion of metalwork.

The report concluded retaining the buildings was "not a realistic option".

Developers say demolishing the blocks is necessary to allow repairs to the neighbouring 23-storey Mill tower, whose residential floors have never been occupied because of defective cladding.

The cleared site would provide access for scaffolding and be used as a construction compound during repair works, which are expected to take around two years.

Once the tower has been refurbished, separate plans would be brought forward to redevelop the site.

Get involved
with the news

Send your news & photos